| Calculations and member design | Design basis, loads, consequence class, materials, national annex, template | Calculation report, member schedule, input files | 5–15 working days |
| Masonry walls and lintels | Wall layout, unit and mortar type, loads, openings | Wall and lintel calculations, bearing checks | 3–10 working days |
| BR18 documentation set | Design basis inputs, calculations, drawings, consequence class | A1–A3 and B1–B3 documents, checker replies | Agreed per project |
| Renovation and conversion | Archive drawings, survey data, material tests, intended change | Load-path review, capacity checks, lintel and strengthening design | 5–15 working days |
| Precast and timber elements | Layout, product catalogue, connection standards | Element calculations and drawings | 5–10 working days per batch |
| BIM and drawings | Architect model or sketches, CAD standard, title blocks | Native model, IFC, drawing set, revision log | 3–10 working days |
| Bridge and infrastructure support | Owner requirements, geometry, load models, design basis | FE model, design checks, report sections | Agreed per package |